Sign In | Join Free | My spintoband.com
spintoband.com
Sussman Machinery(Wuxi) Co.,Ltd
Sussman Machinery (Wuxi) Co., Ltd.
Home > Cable Tray Roll Forming Machine >

12 Stations PLC Control Cable Tray Cover Roll Forming Machine 10-15m/min

Sussman Machinery(Wuxi) Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Sussman Machinery(Wuxi) Co.,Ltd
City: Wuxi
Province/State: Jiangsu
Country/Region: China
Tel: 86-136-0619-3016
Contact Person:
Miss Spring Wu

12 Stations PLC Control Cable Tray Cover Roll Forming Machine 10-15m/min

Brand Name : Sussman
Model Number : RF-CT
Certification : CE,SGS, ISO
Place of Origin : China
MOQ : 1 set
Delivery Time : 65 days after deposit
Packaging Details : Standard Packing with Steel Wire fixed and film coated
Profile width : 90-600mm
Material thickness : 1.0-2.0mm galvanized coils
Profile height : 50-100mm
Uncoiler : 3 ton
Main motor power : 7.5KW
Weight : 3.0T
Speed : 10-15m/min
Roller Material : Gcr15
Price : negotiable
Contact Now

12 Stations PLC Control Cable Tray Cover Roll Forming Machine 10-15m/min


Specifications of cable tray machine:


Items

Specifications

Punching

Way

Hydraulic punching 3 set

Forming system

Rolling Speed

10-15m/min


Roller Stations

About 20stations


Roller Material

Gcr15with quenching


Shaft

Dia 90mm


Main Motor Power

15 kw


Hydraulic cutting Power

7.5 kw

Cutting
system

Material Of Cutting

CR12 with quench treatment


Hardness

HRC58-62


Tolerance

+-1.5mm

Electrical control system

Electric Source

415V, 50HZ,3 phase
Also can satisfy Customer’s require


Control System

PLC (Panasonic) as list in the note


Weight

About 6 tons



Description:

A cable tray system, is "a unit or assembly of units or sections and associated fittings forming a rigid structural
system used to securely fasten or support cables and raceways." Cable trays are used to hold up and
distribute cables. Cable tray roll forming machine is special designed for its production.


Machine Components:

S.N

Equipment name

Quantity

1

10 Ton Passive un-coiler

1 set

2

Coil Levelling device

1 set

3

Hydraulic Punching

3 set

4

Hydraulic Pre-cutting

1 set

5

Main roll forming machine

1 set

6

Hydraulic station

1 set

7

Control system ( including control box)

1 set

8

Out tables

2 units

9

Spare parts

1 package


Working Flow of Roll Forming Machine
Uncoiler—Feeding—Leveling—Punching&Cutting—Roll forming—Output table

Transportation


All goods will be shipped to your country, containers number will be decided with how many machines would you choose


Installation of the machine


The individual components of the machine are installed according to the layout and prepared for the commissioning.

The installation comprises of:

- Installation by Sussman service technicians.

- The following services are included:

- Installation of the machine components.

- Adjustment of the machine components.

- Connection of all motors to the control cabinet.

- Installation of the required safety devices.

Delivery extent does not comprise of:

- Media supply (electrics, compressed air, etc.)to the machine(control cabinet)

- Raw material,process material and fuels

- Raw material for test blocks

- Transport and lifting devices

- Auxiliary staff.

The operators of the plant should be present during the installation in order to become familiar with the new machines.


Commissioning of the machine


The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.

The commissioning comprises:

- Commissioning by Sussman service technicians

- Training at the machine

- The following services are rendered

- Run up of the machine components

- Testing of all functions of the machine components

- Start of a fully automatic molding process

- Execution of machine acceptance

Delivery extent does not comprise of:

- Raw materials, process materials and consumables

- Raw material for test blocks

- Transport and lifting devices

The operators of the plant should be present during the commissioning in order to become familiar with the new machines.


Our After-Sales Service Commitments


Sussman hereby solemnly promises: We implement the “three guarantees” service policy for any equipment sold by Sussman, provide free of charge installation guidelines, commissioning and maintenance of the equipment, training of the Buyer’s relevant Operators; and provide technical requirements for the installation and operation of the equipment, technical layout diagrams and other related information, provide a lifetime supply of maintenance and spare parts

The detailed measures are as follows:

1.Guidelines for installation and commissioning of equipment:

Based on the actual situation, to assist and guide the Buyer and Buyer’s technical personnel in the overall installation location, the installation of equipment, and provide Buyer with answers to their questions and related issues;


2.Provide training for operation and maintenance personnel:

Based on the Buyer’s request, Sussman will provide free of charge training of the operation and maintenance personnel;

a) The User (Buyer) can send their operation and maintenance personnel to our factory for learning and training;

b) When Sussman is doing the installation and test running of the equipment for the Buyer, the Buyer can send their personnel to participate.


3.If failure occurs in any of the machines during the “three guarantees” period(one year), then, upon the Buyer’s request, Sussman will eliminate the failure;


4. Sussman will inform all its Buyers about any upgrades and significant product improvements. Sussman will provide equipment modifications based on their costs. Sussman will provide Buyers with high-quality after-sales services in a careful and responsible attitude, provide very strong guarantee for the Buyer’s normal production.

We provide quick and satisfactory customer service, and promise to respond within 24 hours after receiving your complaints by phone or email


Quality Control


1.We strictly control the quality of raw materials and we can offer inspection certificate of our raw materials for you.
2. We do manufacturing strictly according to the technological processes. Besides, we carry out sampling inspection for our products.
3. All of our workers have received relevant quality management training so that the quality of products can be ensured.
Our goal is to offer the best solution for our customers, supply high quality machine and good service with reasonable price. We sincerely hope to cooperate with worldwide customers for mutual success.


FAQ


1) Q: Are you manufacturer or trading company?
A: We are manufacturer and trading company .

2) Q: Do you provide installing and training overseas?
A: Overseas machine install and worker training services are optional.

3) Q: How is your after sales support?
A: We provide technical support on line as well as overseas services by skillful technicians.


4) Q: How does your factory do regarding quality control?
A: There is no tolerance regarding quality control. Quality control complies with ISO9001. Every machine has to past testing running before it's packed for shipment.

5) How can I trust you that machines pasted testing running before shipping?
A: 1) We record the testing video for your reference. Or,
2) We welcome your visit us and test machine by yourself in our factory.

6) Q: Do you sell only standard machines?
A: No. Most machines are made to order.



Product Tags:

Cable Tray Machine

      

Rolling Form Machine

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

12 Stations PLC Control Cable Tray Cover Roll Forming Machine 10-15m/min Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: Sussman Machinery(Wuxi) Co.,Ltd
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0