Sign In | Join Free | My spintoband.com
spintoband.com
Wuxi Suhang Machinery Manufacturing Co., Ltd.
Wuxi Suhang Machinery Manufacturing Co., Ltd.
Home > Cable Tray Roll Forming Machine >

Hot Dipped Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO

Wuxi Suhang Machinery Manufacturing Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Wuxi Suhang Machinery Manufacturing Co., Ltd.
City: Wuxi
Province/State: Jiangsu
Country/Region: China
Tel: 86-136-0619-3016
Contact Person:
Miss Spring Wu

Hot Dipped Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO

Brand Name : Suhang
Model Number : SH-CT
Certification : CE,SGS,ISO
Place of Origin : Jiangsu,China
MOQ : 1 set
Price : USD20000-31000 per set
Payment Terms : L/C, T/T, MoneyGram, Western Union
Supply Ability : 5 sets per month
Delivery Time : 60 days after deposit
Packaging Details : Film and steel wire
Thickness : 1.0-2.0mm Galvanized steel
Main Power : 5.5kw
Rolling Speed : 10-15m/min
Electric Source : 380V, 50HZ,3 phase
Roller Stations : 10 stations
Cutting : Hydraulic Cutting
Hydraulic Station : 4KW
Control system : Industry computer
Contact Now

Hot Dipped Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO


Technical parameter


ItemsSpecificationsRemarks
Material of coilMaterial Thickness1.0-2.0mm galvanized
Un Coiler3 tons manual
Forming systemRolling Speed10-15 m/min
Roller Stations10 stations
Roller Material

Gcr15 Steel with quenching 60mm shaft


Maim Motor Power5.5 kw
Hydraulic cutting Power4 kw

Cutting

system

Material Of CuttingCR12 with quench treatment
HardnessHRC58-62
Tolerance+-1.5mm
Electrical control systemElectric Source

380V, 50HZ,3 phase

Also can satisfy Customer’s require

Control SystemPLC (Panasonic) as list in the note
WeightAbout 3 tons

Technological process


Uncoiler—Feeding—Leveling—Punching&Cutting—Roll forming—Output table



Machine Picture



Installation of the machine


The Individual components of the machine are installed according to the layout and prepared for the commissioning.


The installation comprises of

- Installation by Suhang service technicians.

- The following services are included.

-Installation of the machine components

-Adjustment of the machine components

- Connection of all motors to the control cabinet

-Installation of the required safety devices.


Commissioning of the machine

The components of the machine are commissioned one after the otherl. At the end of the commissioning the machine is ready for production and is handed over.


The commissioning comprises:

-Commissiong by Suhang Service technicians

- Training at the machine

- The following services are rendered

- Run up of the machine components

- Testing of all functions of the machine components

- Start of a fully automatic molding process

- Execution of machine acceptance


Commercial Conditions


1. Port of Loading: FOB Shanghai

2. Delivery time: 60 days after technical clearance and down payment

3. Payment: 30% TT in advance, balance before delivery

4. Assembly and comissioning: Two engineers will visit buyer's workshop for install, commission and training, the salary of our engineer cost USD100 per day. The customer should ensure the pre-installation being carried out appropriately.

5. Warranty: 12 months warranty starting from the date of the successful installation and commissioning of the equipments.


Related Products



Product Tags:

Cable Tray Machine

      

Rolling Form Machine

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

Hot Dipped Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: Wuxi Suhang Machinery Manufacturing Co., Ltd.
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0